On Thursday, June 21, Gary Clarin of Meilahn Manufacturing brought a sample of the custom tables that are being built for the library. The table has a cherry base with black detailing to coordinate with the library panelling. The work surface is linoleum, sturdy and attractive for writing. Sarah Piller, interior designer of the Troyer Group is examining the table with Gary.
June 19 a truckload of used shelving arrived from California and was moved into the reference area of the new library. Later in the week the summer crew brought up from the basement the support posts that have been stored down there since spring 2006. The posts were cleaned and supported this spring by our SOOP volunteers.
A major change will happen in the new library June 25-27 as all the shelving will be erected by under the supervision of Al Partin of Hallett Library Movers. The work crew includes AMBS students, friends and volunteers.